DaimlerChrysler Services AG, Berlin/Stuttgart
In a VMS Report, six systems lines on four continents in only three months were investigated.
The objective was to obtain resilient cost and performance transparency in the hybrid form of in-house and outsourced operations, small and larger systems, functionally narrower and broader configuration. IT governance was supported over the long term.
